KAVALIPOST

Friday 28 November 2014

EDITORIAL POSTAL CRUSADER DECEMBER-2014 
NDA  AND UPA
TWO  SIDES  OF  SAME  COIN
               New Central Govt. under the leadership of our Hon’ble Prime Minister Shri. Narendra Modi has completed six months in office. As far as the common people and working class of this country is concerned, no positive action has been taken by the Govt. to mitigate their woes and grievances. Instead much negative steps are taken during this six months period.
                   Government has withdrawn the guidelines which controls the pricing of essential medicines through National Pharmaceutical Pricing Authority. As a result, the prices of essential medicines for treatment of cancer, blood pressure, colestorol, diabetics, heart-deceases etc will shoot up in the market. Prices of medicines for treatment of cancer itself which now costs Rs.8500 may go upto Rs.1,08,000/-. Pharmaceutical corporate companies are the beneficiaries.
                   Government has made its intention clear that the number of gas cylinders (LPG) per year will be reduced from existing 12 to 9 and also to link it to Aadhar and subsidies through direct cash transfer to Bank accounts. Earlier UPA Govt. has reduced the gas cylinders from 12 to 9 but subsequently it has been withdrawn the order due to widespread protests.
                   Govt. has deregularised the pricing of diesel. Earlier UPA Govt. has deregulated petrol prices and now the NDA Govt. has deregularised diesel price. Petroleum companies will now be free to decide the prices of petrol and diesel. Even-now the prices of petrol and diesel in India are 40% higher than the prices in the international market.
                   Govt. has decided to allow 100% Foreign Direct Investment (FDI) in Defence Production. Earlier this move of the UPA Govt. was opposed by NDA saying that it is against the national interest and security of the country. Defence production will now be completely privatised.
                   Govt. has decided to allow 100% FDI in Railways and also public-private-partnership (PPP). During his speech delivered in Australia Prime Minister has called upon the Industrialists of that country to country to invest in Indian Railways. Doors for privatisation of Railways is opened.
                   Govt. has decided to allow 49% FDI in Insurance sector. The bill for amending the Insurance Act for this purpose is pending in the Parliament and Govt. spokes person has hoped that the bill will be passed in this winter session of Parliament.
                   Govt. has decided to disinvest the share of all public sector nationalised banks upto 48%. Road map for privatisation of banking sector is drawn.
                   Govt. has made it clear that 100% FDI will be allowed in Pension Funds. The future of those who are under the New Pension Scheme will be uncertain due to Pension Fund Privatisation.
                   Govt has decided to sell the shares of profit making public sector undertakings such as ONGC, BHEL, coal India Ltd. etc to the tune of 25%.
                   Govt. has made it clear that Indian Post Office Act 1898 will be amended to facilitate grant of licences to multi-national courier services.  This will pave way for privatisation of postal sector.
                   While extending red-carpet welcome to the corporates and multinational companies, the Govt. has declared that all the labour laws which put hurdles before them will be amended. Govt. has already moved in Parliament Labour Law amendments to remove all the protections and rights now enjoyed by the working class including right to strike and right to form unions. 
                   Government has declared that all the loss-making public sector undertakings will be closed or privatised.  Air India, BSNL etc. are all in the hit-list.
                   Government has made it clear that its slogan is “minimum government and maximum governance”.  It has imposed a total ban on creation of new posts and for filling up of posts which are lying vacant for more than one year.
                   Regarding Central Government Employees, none of their legitimate demands are conceded by the Government.  DA merger, Interim Relief, Inclusion of Gramin Dak Sevaks (GDS) under 7th CPC, Date of effect of 7th CPC as 1-1-2014, Removal of 5% condition for compassionate appointment - everything stands rejected.
                   Regarding Postal employees none of the 39 demands raised by Postal JCA (NFPE & FNPO) is settled.  Three lakhs GDS are still not included in the 7th CPC and their future is uncertain, Revision of wages of Casual, Part-time, contingent employees with effect from 01-01-2006 is pending before the Government from 2008 onwards.  Cadre Restructuring, issues of Postmaster Cadre, Accountants, System Administrators, MMS etc. all pending or rejected. 
                   It is in the above background the Central Trade Unions, JCM National Council staff-side, Confederation of Central Govt. Employees & Workers and Postal JCA has decided to organise following agitational programmes.
1.      As a part of nation-wide agitation by all Central Trade Unions including BMS, INTUC, HMS, AITUC, CITU etc. has decided to organise Parliament March on 5th December, 2014 to protest against the anti-people, anti-labour policies of the NDA Government.  In the march they will declare future struggle programmes.
2.      All the organisations in the JCM National Council (Staff side) including Railways, Defence and Confederation has decided to organise a National Convention on 11th December, 2014 to decide future course of action for realisation of the legitimate demands of the Central Government employees.
3.      Postal JCA comprising NFPE, FNPO, AIPEU-GDS (NFPE) and NUGDS   has decided to organise a massive Parliament March of 20000 Postal& RMS employees including Gramin Dak Sevaks and Casual, Part-Time, Contingent employees on 4th December, 2014 demanding settlement of 39 point charter of demands.  PJCA has decided to go for indefinite strike.
                   NFPE calls upon the entirety of five lakhs Postal employees to participate in all the above programmes and make it a grand success.  Let us pledge that we shall continue our struggle till success.

BSNL Prepaid : Special Tariff Vouchers ( Updated as on 20/11/2014 )



http://sapost.blogspot.in/


Special Tariff Vouchers


Amount
Talktime
Validity
Description
28
0
30 Days
Local/STD Rs.1.00/3Min (BSNL to BSNL) &Rs.1.20/3 (BSNL to other networks)
34
0
1 Day
80 Min Local/STD Anynet
44
0
30 Days
Local Any Network @ 1.4p/2Sec (available for current plans, Saral Anant and New Nesam special plans only)
47
0
28 Days
Local calls BSNL to BSNL – Rs 0.20 /min
57
0
30 Days
Get 125 minutes free to Local BSNL-BSNL video calls
59
0
30 Days
800 Minutes Local/STD BSNL to BSNL Night (1 1PM to 06AM)
65
0
28 Days
Local BSNL to BSNL @ 12p/Min
71
20
30 Days
Local Any Network @ 30p/Min + TT Rs.20
99
0
30 Days
Local calls from BSNL Mobile to BSNL Mobile --- 10p/min Local calls from BSNL Mobile to Land Line / WLL/Other Networks — 49p/min.
111
90
Unlimited
Usage value Rs.90/- + Free BSNL to BSNL call 70 Min for 20 Days
121
0
30 Days
1 800 Minutes Local/STD BSNL to BSNL Night (11PM to 06AM)
122
0
90 Days
Local Voice Calls Any Network @ 1.4p/2Sec (available for current plans, Saral Anant and New Nesam special plans only)
135
0
30 Days
335 Min Local/STD Anynet
152
0
30 Days
Local & STD Voice Calls BSNL to BSNL 10p/Min & BSNL to other networks 30p/Min
164
0
6 Days
Unlimited Local/STD BSNL to BSNL
213
50
90 Days
Local Any Network @ 30p/Min + Rs.50 (available for current plans and Nesam Group of plans only.)
222
190
Unlimited
Usage value Rs.190/- + Free BSNL to BSNL call 110 Min for 40 Days
290
0
90 Days
Local BSNL to BSNL mobile calls @10p/Min and other local calls @49 p/Min
333
280
Unlimited
Usage value Rs.280/- + Free BSNL to BSNL call 180 Min for 60 days
344
0
27 Days
Unlimited Local BSNL to BSNL
574
0
27 Days
Unlimited Local BSNL to BSNL and 500 Min free Local/STD calls Any - net
699
0
30 Days
Local Calls O n - net Unlimited, BSNL to other networks Local Calls 1500 minutes FREE
701
0
30 Days
Unlimited Local/STD BSNL to BSNL Voice Calls
894
0
81 Days
Unlimited Local BSNL to BSNL
1494
0
81 Days
Unlimited Local BSNL to BSNL and 1500 Min free Local/STD calls Any - net


Validity Extension Plans
Amount
Talktime
Validity
Description
36
0
180 Days
Validity Extension / Plan Migration pack for Per Second Plan
37
0
180 Days
Validity Extension / Plan Migration pack for Per Minute Plan


TOOL FOR RECOVER SUSPECTED SQL DATABASES


Tool For Recover Suspected Database In SQL 2005 / 2008

Script and Developed by : Rajesh C R Compatible SQL Version : SQL 2005 / 2008 Password : dopadmin
Contact Developer: rajeshcr2007@gmail.com
This Tool is only for Recover Suspected database in SQL 2005 only

Instruction

  • Download the attached Tool from PoTools.
  • Execute from Suspected Server Machine.
Note: This Tool is not applicable for SQL 2000 server.

 Download


Google Drive does not allow to upload this tool.

Courtesy : http://potools.blogspot.in/

Top Performer Recognition by Change Management Implementation Committee for Odisha Circle



In recognition of the outstanding contribution towards organizing workshops / meetings to spread awareness and understanding of the IT Modernization Project among the employees, the Change Management Implementation Committee puts on record appreciation for the efforts of the following officers / officials of Odisha Circle in the year 2014. 

Courtesy : http://aipeup3bbsr.blogspot.in

Pre-implementation activities towards preparedness of Branch Post Office for Rural ICT implementation:-



      I.        The BO should have table to place the Handheld Device and for charging the device.

    II.        The electrical power connection is required to charge the Solar UPS wherever power is available. In the locations where electrical power is not available, the UPS will be charged from Solar Panel.

  III.        The locations where electrical power connection is there, it should have proper earthing and with one or two plug points along with on/off switch.

   IV.        The above site preparation is to be done before the roll out starts for the particular Division.

     V.        The data on BO such as the name of the BPMcontact detailsaddress of the BO with land marks etc. may be updated and kept ready.

   VI.        The availability of the network connectivity (Vodafone/ BSNL / Airtel etc.)at the BO location may also accessed and the best signal available in the BO may be identified and kept in order to facilitate the Vendor with details to drive best out of the project. If the network signal is not available, we have to identify as Off-line BO.

 VII.        Similarly identification of the BOs where the solar UPS is not required due to installation problems of the solar panel or good power availability for more than 6 hours daily, has to be also done.  

To view the format for collection of desired information in respect of Branch Post Offices please Click Here.

The complete information in respect of all BOs is to be uploaded to the specific webpage domain name (to be circulated shortly) on the India Post website by 30-12-2014.


Source:-Department of Posts (RB Division) Letter No.01-07/2014-RB dated 27-11-2014. 


DOWNLOAD CPU-Z V1.71.1 FREE : GOOGLE DRIVE DOWNLOAD LINK


CPU-Z v1.71.1 is an application that we can use to find out all the information about the computer or laptop. All the information on the hardware that was installed on our computer can be displayed with complete and accurate by the software CPU-Z v1.71.1

CPU

  • Name and number.
  • Core stepping and process.
  • Package.
  • Core voltage.
  • Internal and external clocks, clock multiplier.
  • Supported instructions sets.
  • All cache levels (location, size, speed, technology).

Mainboard

  • Vendor, model and revision.
  • BIOS model and date.
  • Chipset (northbridge and southbridge) and sensor.
  • Graphic interface.

Memory

  • Frequency and timings.
  • Module(s) specification using SPD (Serial Presence Detect) : vendor, serial number, timings table.

System

  • Windows and DirectX version.

Download CPU-Z Freeware From Google Drive




File Name : CPU-Z v1.71.1 Free
File Size : 1,5 Mb
OS Support : Windows 2000/XP/2003/Vista/7/8

No comments:

Post a Comment